Web contents challenger Forums
Would you like to react to this message? Create an account in a few clicks or log in to continue.

The floor project, Day 5. 2013

Go down

The floor project, Day 5. 2013 Empty The floor project, Day 5. 2013

Post by Admin Sat Aug 10, 2013 3:16 am

2013 2013 2013 It's all over but the drying.<br /><br /><a href="http://www.flickr.com/photos/althouse/9474062052/" title="Untitled by Ann Althouse, on Flickr"><img src="http://farm3.staticflickr.com/2817/9474062052_1792580328.jpg" width="500" height="375" alt="Untitled"></a><br /><br />It will be ready to walk on in 8 hours, and we've got an 8 day break before we move the furniture back. So... ideas for things to do on a big, empty, shiny new floor. Don't say bowling!<br> 2013 2013 2013 <br>It's all over but the drying.<br /><br /><a href="http://www.flickr.com/photos/althouse/9474062052/" title="Untitled by Ann Althouse, on Flickr"><img src="http://farm3.staticflickr.com/2817/9474062052_1792580328.jpg" width="500" height="375" alt="Untitled"></a><br /><br />It will be ready to walk on in 8 hours, and we've got an 8 day break before we move the furniture back. So... ideas for things to do on a big, empty, shiny new floor. Don't say bowling!<br>2013 2013 2013 <br> <a href="http://www.matrixar.com/" title="Matrix ">المصفوفة : أجمل الخلفيات والصور</a>

Admin
Admin

Posts : 64122
Join date : 2013-02-22

https://prowebsites1.forumotion.com

Back to top Go down

Back to top


 
Permissions in this forum:
You cannot reply to topics in this forum